Friday, 4 November 2011

Shooting Schedule.


Shooting Schedule

8 30      Meet in studio to set up and to check lighting and make final adjustments to setting

8 50      Costume check (band should be wearing costumes already)
            Give short brief to band to explain the plan for the day

9 00      Rehearse song through with lighting and playback of track
            Throughout band’s rehearsal – get camera set it right place for first wide shot

9 25      Give feedback on band’s performance – make any adjustments
           
9 30      Begin shooting

Shot list
  • Wide shot of whole band
  • Mid shot of whole band
  • Side shot of drummer and guitarist
  • Mid shot of singer
  • Side shot of singer
  • Side shot of bassist

11 00    Break

11 30    Continue shooting

12 45    Lunch

14 00    Finish off any shots that need to be re-done or think of other possible shots

17 00    Collect camera equipment and bring to Mini Bus in Lower Car Park

17 20    All cast members to meet at Mini Bus in Lower Car Park

17 30    Leave to go to Guildford

18 00    Arrive at Car Park in Guildford

18 10    Dinner – Collect something from Guildford (McDonalds?)

18 30    Set up camera equipment and any lighting equipment if necessary

18 50    Everyone ready to shoot – make up and costume

19 00    Begin shooting

22 00    Finish shooting and travel back to Hurtwood

No comments:

Post a Comment