8 30 Meet in studio to set up and to check lighting and make final adjustments to setting
8 50 Costume check (band should be wearing costumes already)
Give short brief to band to explain the plan for the day
9 00 Rehearse song through with lighting and playback of track
Throughout band’s rehearsal – get camera set it right place for first wide shot
9 25 Give feedback on band’s performance – make any adjustments
9 30 Begin shooting
Shot list
- Wide shot of whole band
- Mid shot of whole band
- Side shot of drummer and guitarist
- Mid shot of singer
- Side shot of singer
- Side shot of bassist
11 00 Break
11 30 Continue shooting
12 45 Lunch
14 00 Finish off any shots that need to be re-done or think of other possible shots
17 00 Collect camera equipment and bring to Mini Bus in Lower Car Park
17 20 All cast members to meet at Mini Bus in Lower Car Park
17 30 Leave to go to Guildford
18 00 Arrive at Car Park in Guildford
18 10 Dinner – Collect something from Guildford (McDonalds?)
18 30 Set up camera equipment and any lighting equipment if necessary
18 50 Everyone ready to shoot – make up and costume
19 00 Begin shooting
22 00 Finish shooting and travel back to Hurtwood